KODIAK SOCKEYE producer of KODIAK SMOKED SALMON and WILD ALASKAN LOX

Progress Report
Home
Wild or Farmed
Crew Jobs
About Us
Shipping
Salmon Prices
Contact Info
Skipper Job

 Tasks to complete project (unfinished in red)
     
-got all pumps and hydraulics working
-added new life raft and epirb
-painted engine
-brought new batteries aboard
-installed new alternator and temporary gages
-fixed shifter at pilot house
-framed in galley and bunks
-sheathed forepeak with plywood
-built floor in forepeak
-sheathed head and framed in sink counter
-added mast lights
-added deck lights
-fixed three port holes with new poly carbonate
-removed stern ramp and sold
-removed purse drum and sold
-removed large deck winch from base behind house
-mounted new refrigeration system in cabin
-mounted new 40 kw gen set in cabin
-built base for toilet tank and hot water heater
-built state room and trimed out
-sheathed walls in aft room
-rebuilt stern
-replaced door handle and lock on main entrance
-mounted lights in the engine room
-removed hydraulic pump and hoses that fed stern ramp and drum
-replaced water separator and oiler for air system
-dismantled old exhaust on old gen set
-framed in aft room bunk
-framed in gen set room
-started pilot house sheathing
-mounted breaker box for 110 volt system
-made and mounted panel for 12 volt system
-started deck fish freezing box
-built new base for smaller seine winch
-started exhaust system for gen set  (as of March 5)
-wired boat and added lights
-added stereo and speakers
-plumbed sinks toilet and shower
-fiberglassed head
-welded on stern butt plate for skiff
-fiberglass shaft alley in main hold
-plumbed and wired refrigeration system
-finish and trim out and paint pilot house
-fixed bow thruster relay and test
-finished deck freezing box
-hauled boat out and cleaned hull then painted with botom paint
-grind off mounts for drum
-reconfigured main hatch covers to be water tight
-fixed power steering
-added new radar, plotter, radios and depth sounder and antenaes
-make and install matresses and cushions
-built galley table
-trimmed out galley and bunks
-added door to head
-carpet walls around bunks
-installed vent for stove
-installed new rule pumps in shaft alley and engine room
-installed vent for gen set room
-installed new transducer
-cut out and refiberglass holes between port and starboard hold
-took 2 day HACCP training class
-take 1 day refrigeration class
-get a skiff
-made scuppers fish tight with 3/4 round bar
-finished exhaust system on gen set
-got throttle working at topside and pilot house stations
-add some new hydraulic lines where chafed
-mounted seine winch and hook up hydraulic lines
-built shelves below 7th bunk and doors
-paint interior
-added new leather steering helm chair in pilot house
-added new vinyl steering helm chair top side
-build door to machinery room
-finish ceiling
-wire new alarm panel
-insulate and cover copper tubing on deck with aluminum
-insulate top of deck freezer box
-grub up
 
 
 

Enter content here

Enter supporting content here