Tasks to complete project (unfinished in red)
-got all pumps and hydraulics working
-added new life raft and epirb
-painted engine
-brought new batteries aboard
-installed new alternator and temporary gages
-fixed shifter at pilot house
-framed in galley and bunks
-sheathed forepeak with plywood
-built floor in forepeak
-sheathed head and framed in sink counter
-added mast lights
-added deck lights
-fixed three port holes with new poly carbonate
-removed stern ramp and sold
-removed purse drum and sold
-removed large deck winch from base behind house
-mounted new refrigeration system in cabin
-mounted new 40 kw gen set in cabin
-built base for toilet tank and hot water heater
-built state room and trimed out
-sheathed walls in aft room
-rebuilt stern
-replaced door handle and lock on main entrance
-mounted lights in the engine room
-removed hydraulic pump and hoses that fed stern ramp and drum
-replaced water separator and oiler for air system
-dismantled old exhaust on old gen set
-framed in aft room bunk
-framed in gen set room
-started pilot house sheathing
-mounted breaker box for 110 volt system
-made and mounted panel for 12 volt system
-started deck fish freezing box
-built new base for smaller seine winch
-started exhaust system for gen set (as of March 5)
-wired boat and added lights
-added stereo and speakers
-plumbed sinks toilet and shower
-fiberglassed head
-welded on stern butt plate for skiff
-fiberglass shaft alley in main hold
-plumbed and wired refrigeration system
-finish and trim out and paint pilot house
-fixed bow thruster relay and test
-finished deck freezing box
-hauled boat out and cleaned hull then painted with botom paint
-grind off mounts for drum
-reconfigured main hatch covers to be water tight
-fixed power steering
-added new radar, plotter, radios and depth
sounder and antenaes
-make and install matresses and cushions
-built galley table
-trimmed out galley and bunks
-added door to head
-carpet walls around bunks
-installed vent for stove
-installed new rule pumps in shaft alley and engine room
-installed vent for gen set room
-installed new transducer
-cut out and refiberglass holes between port
and starboard hold
-took 2 day HACCP training class
-take 1 day refrigeration class
-get a skiff
-made scuppers fish tight with 3/4 round bar
-finished exhaust system on gen set
-got throttle working at topside and pilot house stations
-add some new hydraulic lines where chafed
-mounted seine winch and hook up hydraulic
lines
-built shelves below 7th bunk and doors
-paint interior
-added new leather steering helm chair in pilot house
-added new vinyl steering helm chair top side
-build door to machinery room
-finish ceiling
-wire new alarm panel
-insulate and cover copper tubing on deck with aluminum
-insulate top of deck freezer box
-grub up